Cheapest Factory Cnc Pipe Threading Lathe - Soft Gate Valve Production Line – Oturn

Introduction:


Product Detail

Related Video

Feedback (2)

With our rich working experience and thoughtful companies, we have now been recognized as being a trustworthy supplier for a lot of global potential buyers for Plastic Mold Factory, Vertical Lathe Cnc, Cnc Vertical Turret Lathe, All merchandise are manufactured with advanced equipment and strict QC procedures in purchase to assure high-quality. Welcome prospects new and old to get hold of us for enterprise cooperation.
Cheapest Factory Cnc Pipe Threading Lathe - Soft Gate Valve Production Line – Oturn Detail:

1.The operator places the pallet full of valve body workpieces in the loading positioning slot 1 and the loading positioning slot 2 for positioning, and places the empty tray in the loading positioning slot 1 and the unloading positioning slot 2 for positioning.

2.The camera on the robot 1 scans the workpiece on the pallet in the feeding positioning slot 1 to accurately position the workpiece, and the workpiece 1 is clamped and placed in the positioning fixture on the buffer table 1.
At the same time, it grips the processed workpiece 3 (the robot 2 has just gripped it from the machine tool 2), moves to the unloading positioning slot 1 and places it neatly in the pallet as required.
The camera on the robot 1 scans the workpiece on the pallet in the feeding positioning slot 2 to accurately position the workpiece, and the workpiece 4 is clamped and placed in the positioning fixture on the buffer table 2.
At the same time, it grips the processed workpiece 6 (the robot 3 has just gripped it from the machine tool 4), moves to the unloading positioning slot 2 and places it neatly in the pallet as required.

3.The robot 2 clamps the workpiece 1 from the buffer table 1 and runs to the machine tool 1, grips the finished workpiece 2 and clamps the workpiece 1, runs to the machine tool 2, grips the finished workpiece 3 and clamps the workpiece 2, and runs to the buffer table 1. Place the workpiece 3. Robot 2 completes the cycle.

4.The robot 3 grips the workpiece 4 from the buffering table 2 and runs to the machine tool 3, grips the finished workpiece 5 and clamps the workpiece 4, runs to the machine tool 4, grips the finished workpiece 6 and clamps the workpiece 5, and runs to the buffer table 2. Place the workpiece 6. Robot 3 completes the cycle.

dffd
adcdfgvbfgdhb
ndfhjvbfjv
15626

The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
5 Stars By Alice from Russia - 2018.06.21 17:11
Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
5 Stars By tobin from Manchester - 2018.04.25 16:46

Send your message to us:

Write your message here and send it to us