Hot Sale for Lathe Machine Pipe Threading - Soft Gate Valve Production Line – Oturn

Introduction:


Product Detail

Related Video

Feedback (2)

So that you can finest fulfill client's demands, all of our operations are strictly performed in line with our motto "High Excellent, Competitive Price, Fast Service" for Manual Vertical Lathe, 5 Axis Cnc Machining Center, Vtl Lathe, Let's cooperate hand in hand to jointly make a beautiful upcoming. We sincerely welcome you to pay a visit to our company or speak to us for cooperation!
Hot Sale for Lathe Machine Pipe Threading - Soft Gate Valve Production Line – Oturn Detail:

1.The operator places the pallet full of valve body workpieces in the loading positioning slot 1 and the loading positioning slot 2 for positioning, and places the empty tray in the loading positioning slot 1 and the unloading positioning slot 2 for positioning.

2.The camera on the robot 1 scans the workpiece on the pallet in the feeding positioning slot 1 to accurately position the workpiece, and the workpiece 1 is clamped and placed in the positioning fixture on the buffer table 1.
At the same time, it grips the processed workpiece 3 (the robot 2 has just gripped it from the machine tool 2), moves to the unloading positioning slot 1 and places it neatly in the pallet as required.
The camera on the robot 1 scans the workpiece on the pallet in the feeding positioning slot 2 to accurately position the workpiece, and the workpiece 4 is clamped and placed in the positioning fixture on the buffer table 2.
At the same time, it grips the processed workpiece 6 (the robot 3 has just gripped it from the machine tool 4), moves to the unloading positioning slot 2 and places it neatly in the pallet as required.

3.The robot 2 clamps the workpiece 1 from the buffer table 1 and runs to the machine tool 1, grips the finished workpiece 2 and clamps the workpiece 1, runs to the machine tool 2, grips the finished workpiece 3 and clamps the workpiece 2, and runs to the buffer table 1. Place the workpiece 3. Robot 2 completes the cycle.

4.The robot 3 grips the workpiece 4 from the buffering table 2 and runs to the machine tool 3, grips the finished workpiece 5 and clamps the workpiece 4, runs to the machine tool 4, grips the finished workpiece 6 and clamps the workpiece 5, and runs to the buffer table 2. Place the workpiece 6. Robot 3 completes the cycle.

dffd
adcdfgvbfgdhb
ndfhjvbfjv
15626

The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
5 Stars By Lesley from Panama - 2018.06.09 12:42
With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
5 Stars By Gwendolyn from Ukraine - 2018.06.12 16:22

Send your message to us:

Write your message here and send it to us