China 2021 China New Design Valve Turning Lathe Machine - Soft Gate Valve Production Line – Oturn factory and manufacturers | Oturn

2021 China New Design Valve Turning Lathe Machine - Soft Gate Valve Production Line – Oturn

Introduction:


Product Detail

Related Video

Feedback (2)

Our pursuit and corporation aim should be to "Always satisfy our consumer requirements". We carry on to build and style and design remarkable quality items for both our outdated and new clients and reach a win-win prospect for our clients at the same time as us for Horizontal Cnc, Gantry Type Planer Milling Machine, Cnc Horizontal Milling Machine, Many years of work experience, we have realized the importance of providing good quality products and the best before-sales and after-sales services.
2021 China New Design Valve Turning Lathe Machine - Soft Gate Valve Production Line – Oturn Detail:

1.The operator places the pallet full of valve body workpieces in the loading positioning slot 1 and the loading positioning slot 2 for positioning, and places the empty tray in the loading positioning slot 1 and the unloading positioning slot 2 for positioning.

2.The camera on the robot 1 scans the workpiece on the pallet in the feeding positioning slot 1 to accurately position the workpiece, and the workpiece 1 is clamped and placed in the positioning fixture on the buffer table 1.
At the same time, it grips the processed workpiece 3 (the robot 2 has just gripped it from the machine tool 2), moves to the unloading positioning slot 1 and places it neatly in the pallet as required.
The camera on the robot 1 scans the workpiece on the pallet in the feeding positioning slot 2 to accurately position the workpiece, and the workpiece 4 is clamped and placed in the positioning fixture on the buffer table 2.
At the same time, it grips the processed workpiece 6 (the robot 3 has just gripped it from the machine tool 4), moves to the unloading positioning slot 2 and places it neatly in the pallet as required.

3.The robot 2 clamps the workpiece 1 from the buffer table 1 and runs to the machine tool 1, grips the finished workpiece 2 and clamps the workpiece 1, runs to the machine tool 2, grips the finished workpiece 3 and clamps the workpiece 2, and runs to the buffer table 1. Place the workpiece 3. Robot 2 completes the cycle.

4.The robot 3 grips the workpiece 4 from the buffering table 2 and runs to the machine tool 3, grips the finished workpiece 5 and clamps the workpiece 4, runs to the machine tool 4, grips the finished workpiece 6 and clamps the workpiece 5, and runs to the buffer table 2. Place the workpiece 6. Robot 3 completes the cycle.

dffd
adcdfgvbfgdhb
ndfhjvbfjv
15626

Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
5 Stars By Elizabeth from Jakarta - 2018.09.21 11:01
Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
5 Stars By Phoenix from USA - 2018.07.12 12:19

Send your message to us:

Write your message here and send it to us